Record the starting point before switching on
How long does a price-list change take today? Who checks that the old offer has been removed? How many people are involved? Record several actual updates and the time they require. Repeat the same steps after the pilot. This compares your own process instead of relying on general promises about savings or sales.
Check the space, equipment and operating conditions
List screen models, connections, positions, orientation and network availability. Consider glare, viewing distance and operating hours. Do not assume every existing television suits every purpose. When preparing VisioCast, we agree the required setup and equipment checks. Also agree and test the procedure for a connection failure or an unavailable screen.
Prepare a small campaign with a clear owner
Start with the regular offer, one time-limited message and one service notice. Assign a content approver and a deputy. Check the display on site, the schedule’s start and end, and the return to regular content. Connect VisioCast’s screen and schedule planning with these simple working rules.
Measure what you can establish reliably
Update time, outdated messages and staff feedback can be useful measures. A playback record does not prove that someone saw a message or bought a product. If you track sales, account for prices, seasonality, availability and other campaigns. Conclusions about impact should match the evidence you actually have.
We plan expansion around the pilot’s findings
Our approach at S-Consulting Group connects software to an actual business task. For a business in Bosnia and Herzegovina, this means agreeing equipment, content, responsibilities, training and support. Reviewing the pilot makes it easier to choose the next locations and define costs. Enquire about VisioCast with the number of locations and a description of your first campaign.